I. Overview
Stainless steel channel gate of the Company is the introduction of foreign advanced production technology, using soft rubber seal, a light weight, flexible operation, anti-corrosion, not rusty, installation and maintenance convenient, reliable sealing function can be widely used in sewage treatment plants, water supply Plants, drainage and irrigation, environmental protection, power, rivers and other projects, as the deadline for adjustment and control of water flow purposes.
Second, characteristics
1. Light weight: cast iron gate was about 1 / 3 of weight;
2. Corrosion-resistant: Acid degrees and the most corrosive chemicals and sewage and water;
3. Sealing good: The rubber to metal seals, sealing performance good;
4. Torque small: As the ram light weight, ram and rails and the friction of the rubber seal small, it makes hand wheel torque small operation;
5. Long life: sealing surface wear is very small, long life;
6. Ease of installation: gateway box pouring concrete through the second fixed, convenient and reliable.

5, prior to the installation ready
1. Show shipping list, count the number of goods and fasteners, such as the number of spare parts inventory and whether the line at the same time do a good job in the custody of the goods work.
2. Gates in the process of deformation and damage, it is necessary to conduct a comprehensive inspection and repair, not installed gates to be placed level to prevent deformation of sealing, but will screw-connected and can not be bent by the force.
3. Examination Civil size, embedded parts, and reserve chutes-and whether to meet the requirements to ensure that its flatness and verticality of 1.5 to 3 percent range.
4. According to the size of gate connecting the designated hole the size of drilling and installation of the wall faces.
5. Installation of all the staff arrived at the scene and ready to install the necessary equipment (such as: cranes, welding, scaffolding, etc.), installation tools and measurement tools.
五. Installation
1. Leadscrew and will ram installed, fastening good.
2. Gates will be installed to lifting position, as far as possible the attention of ram, lifting the overall box gate, when the gate specifications arrested at the scene too much or not the overall position of lifting, can be disassembled box gate and the gate after the lifting, respectively, subject to The need to protect the good sealing surface.
3. Gates will be installed to the overall Diaoqi position, the gate in place, with expansion stud gateway box will be fixed on the wall, and hanging with the level of lead hammer-and-check method to install gates whether the flatness and verticality of 0.5 ~ 1% of the requests;
4. Adjustment of the vertical gate closed, by adjusting the gate of the bolt so that the sealed gates of the vertical error of less than 1 / 1000 mm, and once again review the direction of the tilt after the gate around the four corners of the central and bolts used Sizing Block pad is, on a nut, through, under the seal of the two nut adjustment of the vertical error, so firmly fixed.
5. Need to ram and the gateway box anastomosis, with Cypriot-foot inspection, under the seal of the gap so that the gap remained at 0.1 mm within the allowed level during the Gap, where the gate frame into the back pad ramps iron, at the same time, Expansion bolts slightly spin-up space qualified so far.
6. Gates will be around the concrete surface with the second expansion concrete casting, stamping, attention shall not be used in concrete, watering after the application of vibration pump tamping solid, concrete secondary watering completely solidified, and then one by one inspection fastening nut.
7. Specifications larger gate will be installed rails in place, rails and door frames to maintain a straight line less than 2 mm.
8. Hoist through the screw, Screw screw in the nuts.
9. Hoist on the floor to draw the corresponding cross lines, will hoist the initial components in place, shake hands round.
10. Shaft installation guide planes, the attention of the casing sets in the corresponding sub Department.
11. Reexamination of the vertical spindle error of less than 1 / 500 mm, a total length of less than 5 mm, and then hoist (bearing) and floor-embedded solid plate welding.
12. Axis will be guided-installed in place, with pre-sets in the casing with screw bolts fastening, the attention of the shaft and screw-guided Care, in particular the lower part of a guided-axis to ram the distance should be larger than X-calibre gate . The remaining axis in the lead-gate course of the hoist shall not be connected with the screw sets Xiangpeng.
13. Shielding will hoist in place, with bolts fastening the top of the hoist.
2, debugging
2.1 to the hands-round, check the door of the sliding door frame from top to bottom in the flexibility and availability of wedge tight.
2.2 water test to see whether the effect of sealing gate good, such as water leakage should identify the reasons for re-tested until Bulou Shui far.
6, use and maintenance
l, a regular basis (one year or six months) to conduct a maintenance equipment, screw and nut part Oiling hand wheel.
2, regular (one year or six months) to conduct a comprehensive inspection of equipment, especially the rubber seal parts to see if damage, if maintenance should be carried out until the resumption date.

I. Overview
Stainless steel channel gate of the Company is the introduction of foreign advanced production technology, using soft rubber seal, a light weight, flexible operation, anti-corrosion, not rusty, installation and maintenance convenient, reliable sealing function can be widely used in sewage treatment plants, water supply Plants, drainage and irrigation, environmental protection, power, rivers and other projects, as the deadline for adjustment and control of water flow purposes.
Second, characteristics
1. Light weight: cast iron gate was about 1 / 3 of weight;
2. Corrosion-resistant: Acid degrees and the most corrosive chemicals and sewage and water;
3. Sealing good: The rubber to metal seals, sealing performance good;
4. Torque small: As the ram light weight, ram and rails and the friction of the rubber seal small, it makes hand wheel torque small operation;
5. Long life: sealing surface wear is very small, long life;
6. Ease of installation: gateway box pouring concrete through the second fixed, convenient and reliable.

5, prior to the installation ready
1. Show shipping list, count the number of goods and fasteners, such as the number of spare parts inventory and whether the line at the same time do a good job in the custody of the goods work.
2. Gates in the process of deformation and damage, it is necessary to conduct a comprehensive inspection and repair, not to install gates to be placed level to prevent deformation of sealing, but will screw-connected and can not be bent by the force.
3. Examination Civil size, embedded parts, and reserve chutes-and whether to meet the requirements to ensure that its flatness and verticality of 1.5 to 3 percent range.
4. According to the size of gate connecting the designated hole the size of drilling and installation of the wall faces.
5. Installation of all the staff arrived at the scene and ready to install the necessary equipment (such as: cranes, welding, scaffolding, etc.), installation tools and measurement tools.
五. Installation
1. Leadscrew and will ram installed, fastening good.
2. Gates will be installed to lifting position, as far as possible the attention of ram, lifting the overall box gate, when the gate specifications arrested at the scene too much or not the overall position of lifting, can be disassembled box gate and the gate after the lifting, respectively, subject to The need to protect the good sealing surface.
3. Gates will be installed to the overall Diaoqi position, the gate in place, with expansion stud gateway box will be fixed on the wall, and hanging with the level of lead hammer-and-check method to install gates whether the flatness and verticality of 0.5 ~ 1% of the requests;
4. Adjustment of the vertical gate closed, by adjusting the gate of the bolt so that the sealed gates of the vertical error of less than 1 / 1000 mm, and once again review the direction of the tilt after the gate around the four corners of the central and bolts used Sizing Block pad is, on a nut, through, under the seal of the two nut adjustment of the vertical error, so firmly fixed.
5. Need to ram and the gateway box anastomosis, with Cypriot-foot inspection, under the seal of the gap so that the gap remained at 0.1 mm within the allowed level during the Gap, where the gate frame into the back pad ramps iron, at the same time, Expansion bolts slightly spin-up space qualified so far.
6. Gates will be around the concrete surface with the second expansion concrete casting, stamping, attention shall not be used in concrete, watering after the application of vibration pump tamping solid, concrete secondary watering completely solidified, and then one by one inspection fastening nut.
7. Specifications larger gate will be installed rails in place, rails and door frames to maintain a straight line less than 2 mm.
8. Hoist through the screw, Screw screw in the nuts.
9. Hoist on the floor to draw the corresponding cross lines, will hoist the initial components in place, shake hands round.
10. Shaft installation guide planes, the attention of the casing sets in the corresponding sub Department.
11. Reexamination of the vertical spindle error of less than 1 / 500 mm, a total length of less than 5 mm, and then hoist (bearing) and floor-embedded solid plate welding.
12. Axis will be guided-installed in place, with pre-sets in the casing with screw bolts fastening, the attention of the shaft and screw-guided Care, in particular the lower part of a guided-axis to ram the distance should be larger than X-calibre gate . The remaining axis in the lead-gate course of the hoist shall not be connected with the screw sets Xiangpeng.
13. Shielding will hoist in place, with bolts fastening the top of the hoist.
2, debugging
2.1 to the hands-round, check the door of the sliding door frame from top to bottom in the flexibility and availability of wedge tight.
2.2 water test to see whether the effect of sealing gate good, such as water leakage should identify the reasons for re-tested until Bulou Shui far.
6, use and maintenance
l, a regular basis (one year or six months) to conduct a maintenance equipment, screw and nut part Oiling hand wheel.
2, regular (one year or six months) to conduct a comprehensive inspection of equipment, especially the rubber seal parts to see if damage, if maintenance should be carried out until the resumption date.
Complete answer, thank you


大家帮忙翻译下
其次,你需要找到一个数(通常是3个)人,你写推荐信。这些人有更好的尊重教授,在您打算领域的研究(在这种情况下,财政)或你的老师说,知道你是好欣赏你的才华。第三,你需要准备下列文件,请登陆:一份个人陈述(即你写来形容你的动机研究,并展示你的才干,并最终说服了加州大学洛杉矶分校adi...

请大家帮忙翻译一段英文对话```拜托
Trainyard Anya:好工作在这里得到如此斋戒。这一个任务也有 priority.Target:Josef Priboi。你即将为任务报告位于他而且带来出他。Josef 是与弹头的强夺的我们的 onlu 联编。钟斯:是的,是。我需要知道他是的一件事物。Anya:Josef 在一个军事的飞机场被拿着。整个的区域有优良的空中防御。我们必须安置你...

请大家帮忙把这段中文翻译成英文,请不要用普通的软件翻译,那都不准的...
For the sake of love I can leave a house and give up everything.For have access to you so a little, and result?All of everythings are money!You can give up with my 7 years of feelings, with 1 by himself\/herself not love, also not love own person's matrimony, original ...

请大家帮忙翻译一下这段文字.我万分感谢
Dear judges:Thank you so much for giving me this opportunity to be here.My name is …, and I am 25 years old. I have already graduated from a vocational school, but now I am studying hard to get the bachelor degree.I used to be a webpage designer in a large network ...

帮忙翻译一下,不胜感激!请不要机器翻译的那种,要通顺的,谢谢大家!
如果患者有接触者,包括同桌,同房以及玩伴儿,那么,准备一份清单为了 防止更大范围的传播,让他们远离病人所在的房间,带上口罩,洗手 如果是和疑似患者接触,那要将相关情况进行上报。④Transportation to the medical institution ◆Transport the patient suspected to have SARS to the medical ...

请大家帮忙翻译一下,要流利的英语,不是翻译器
Enrollment at the beginning of study had been recruited Hospital Department of Student Union, and because of outstanding performance, recommend to the school study the Department of Student Union, involved in organizing various types of learning activities in schools, including the plans, ...

帮忙翻译一下,谢谢大家
老king。我授予你一个光荣的任务——做我的马,让我骑。我们去帮助那些危难中的人,就像个勇敢的骑士。什么?骑我?我做你的马?!对呀,你听的没错,怎么了?哦,哦,没什么,好主意。非常好。你是个勇敢的海盗!上来吧。驾!出发!杀死所有的坏蛋!快点跑!哎呀。妈妈,爸爸!爸,你们在干吗...

急!急需翻译一份简历,望高手鼎力相助,万分感谢:)
该公司是一家专门从事市场活动策划实施、渠道关系管理、数据库营销、科技图书策划出版等方面的外商独资渠道市场服务公司,主要服务对象是跨国IT企业,帮助其在数字领域占领市场,为客户提供最一流的市场服务机构。The company is a market that specializes in the implementation of planned activities, channel...

求英文翻译,急用啊(公司广交会的一份英文翻译,英译中)哪位高手帮帮忙...
and large state-owned enterprises letter bearing, jointly established a good cooperation mode.The future of Kang Fen, will continue to improve their own, dedicated to domestic and foreign customers to provide more quality services, common prosperity.希望能帮到你 (从广州市 开始)...

大家帮帮忙 翻译几个句子 急!!!
我相信自己已经具备了在社会中拼搏的能力与实力,非常盼望得到贵单位一份与本专业相关的金融类、经济类、管理或市场方向的的职位. 我个人认为,一个人尽其所能和发展才是最重要的!谢谢!!--- 本人性格开朗、稳重、有活力,待人热情、真诚。工作认真负责,积极主动,能吃苦耐劳。有较强的组织能力、实...

河北区15068685541: 请帮忙翻译一段机械产品说明书,汉译英.机器翻译免进. -
盖严爱捷: As the process of moving conveyor belt tension screw may twist the handle, so the belt is tight state machine must be adjusted before use conveyor belt (the direction of the paper stand out, while the first release on both sides of the handle, loose to ...

河北区15068685541: 帮忙翻译下机械行业的词语(汉译英) -
盖严爱捷: Nbong

河北区15068685541: 求好心人帮忙翻译机械英语 ,在线等急求,,,不要软件翻译的那种,谢谢大家帮帮我 -
盖严爱捷: 一种有限元模型模拟的精密和超精密磨削钢,描述了开发过程中的温度场建议.磨削被参照使用商业隐式有限元代码马克.为了获得所需的模型的输入的数据,检查工件的热损伤,具有相同磨削条件,但使用不同的氧化铝上相同的工作材料的不同粘结砂轮进行了一系列的实验,从获得数值结果的比较.好难- -

河北区15068685541: 翻译一个小短句(汉译英)严厉打击机械翻译 -
盖严爱捷: My English is not very good. I hope I can learn more from you.或者I need your advice.都可以啦 O(∩_∩)O~

河北区15068685541: 使用说明书翻译,找谁翻译比较好?是机械类的使用说明书,需要翻译成英语,麻烦大家说一下咯. -
盖严爱捷: 像这机械类的翻译,需要找相应的翻译机构或翻译平台翻译,而翻译达人,就是个比较好的翻译机构,涉及的语种和翻译较多,能满足大众的需求

河北区15068685541: 请大家帮翻译一下机械英语
盖严爱捷: 加工是所有制造业进程中最广泛使用以及最重要的环节.利用电力驱动的设备,使材料转变为零件,这个形体成长过程我们称之为-加工

河北区15068685541: 请机械加工高手帮忙翻译一份简历,翻译成英文的.
盖严爱捷: Resume Name Sex Male Wang ZuopingAge 26 Date of Birth 1986-05-18City of Dalian in the machining industryEthnic Chinese academic level professionalsMarital status Single ID ***Native of Jinzhou District of Dalian City, Liaoning ...

河北区15068685541: 英语高手请进,请大家帮我翻译一下这段英语,要专业点的翻译啊!!好的话会再加分的,机械翻译的免进! -
盖严爱捷: mainly engage in tooling jig design and development,can do mechanical layout with CAD and Proe, assembling,debugging and improving large scale auto machine.skillfully in using Office Software,Pro/E,AutoCAD.Good English in listening,speaking,reading and writting.

河北区15068685541: 一段汉译英文章,请大家帮忙啦!请大家帮忙啦!把以下文章翻译成英文
盖严爱捷: The aircraft making use of radio navigation equipment to crane one's neck to look forward flies to the broadcasting station , flying toward broadcasting station. Whose ...

河北区15068685541: 求高手翻译一段机械专业英语
盖严爱捷: CAD / CAM是一个统一的软件系统,其中一部分是内部的CAD与CAM的当前民航system.The最终结果的计算机接口/ CAM系统通常是在一个列表中的一部分程序或殴打tape.In先进的CAD / CAM系统的部分程序可以直接反馈到数控机床和检查站控制计算机. CAD/CAM 是一个统一的软件系统、 CAD 部分 CAM system.The 端计算机内部对接,当前的 CAD/CAM 系统的结果通常是部分程序的列表形式或控制计算机数控机床和检验站可以被直接输入一个先进的 CAD/CAM 系统的部分程序的冲孔的 tape.In.

本站内容来自于网友发表,不代表本站立场,仅表示其个人看法,不对其真实性、正确性、有效性作任何的担保
相关事宜请发邮件给我们
© 星空见康网